01 — Compute
Grok on Australian ground
A sovereign southern-hemisphere inference and training node. Not a Memphis copy. Built to NSW 2026 energy rules: underwrite new generation, recycle water, pay for the network it needs.
- Phase 1: 150–250 MW, expandable — not a 1.2 GW surprise
- Cooling from recycled wastewater, never drinking supply
- On-site storage + contracted new renewables; no unpermitted turbines
- APAC latency, AUKUS-aligned sovereign compute, local jobs